Known worn out hydraulic circuits addressed: Main line pressure, Main boost pressure, Secondary pressure, Solenoid regulator pressure, Torque converter apply and release, When hot 1-2 / 2-3 / 3-4 cutloose, flare bang shifts, Harsh delayed engagements. All valve bodies are run through a series of shift cycles at operating temperature, then precisely calibrated using state-of-the-art valve body test equipment to verify proper operation of the pressure/control circuits. Computer-generated test results are compared side-by-side with new OEM valve bodies. This comprehensive integrated testing process is only possible using proprietary software in conjunction with the latest generation Hydra-Test® valve body machine.
Main Valve Body Assembly; Early, w/o Cast or Cast A